Specifying a subsea switch and cable assembly

Build one specification for the sensing device, underwater connector, cable and control-system termination.

Define both ends before ordering

Identify the exact switch interface and the receiving equipment or free-end termination. Record connector gender, contact numbering, pin allocation and the viewing direction used on the drawing. A cable with the correct number of conductors is not sufficient evidence of a compatible interface.

Describe the installed cable route

Supply installed length, route and service allowance separately. Include fixed or moving operation, support points, abrasion exposure and any bend or torsion requirements. Record whether a repairable connection or a permanently moulded termination is preferred and why.

Information to include in your enquiry

Use the following checklist to capture the configuration. Where a value or drawing is not available, identify it as an open requirement for the engineering review.

Information to include in your enquiry
RequirementWhat to record
Sensor endExact mating reference and approved interface drawing
CableLength, conductor arrangement, jacket and movement conditions
Control endConnector or free leads; screen and earth treatment
AcceptanceContinuity, insulation and environmental verification scope

Confirm the complete configuration

Confirm the final part and assembly numbers, documentation revision and agreed acceptance requirements with the quotation. Product imagery is useful for identifying the concept; approved drawings and configuration-specific records define the supplied assembly.

Write a cable schedule that defines both ends

A cable length and connector family are not enough to define an assembly. Record the switch-side mating interface, equipment-side termination and the electrical assignment between them. Include the installed movement and how each termination is supported.

Write a cable schedule that defines both ends
FieldExample of the information required
Sensor endExact mating half, contact count, gender and locking arrangement
Equipment endConnector reference or open-end pigtails with required strip lengths
Electrical schedulePin-to-pin or pin-to-wire mapping; unused cores and shield treatment
Cable routeFinished length, fixed or moving duty, bend envelope and clamp locations
EnvironmentExternal working pressure, temperature and water/media exposure
AcceptanceContinuity, insulation and any agreed pressure-test documentation

Specification questions

What should I provide to start an engineering review?

Send the application and movement description, environmental conditions, control-system interface and any existing drawings or part references. Include the required cable route and the points that still need to be resolved.

Can I use any six-core cable with a six-pin subsea switch?

Contact count alone does not establish compatibility. The mating interface, pin allocation, conductor ratings, jacket, termination sealing and installed duty must all suit the supplied switch and equipment.